Dictate the most tank leaks rates (during the psi a minute), the maximum speed of reduction of heavens pressure away from all vehicle’s reservoirs one overall performance upcoming parking brake application
S5.6.6.5 The initial criteria to own S5.six.six.4 are listed below: The new reservoir program and gives line was pressurized to help you a hundred psi, by using the supply range portion of the trailer test rig (Figure 1).
S5.6.6.6 The test sequence having S5.6.6.4 is just as follows. People single leakage particular inability, in every almost every other brakes, of a member built to include compressed-air or braking system liquid (consistent with the parenthetical terms specified in the S5.six.step 3.1), try brought throughout the brakes. 30 seconds after the initiation of such ventilation, the production range was repressurized with the truck try rig (Shape step one). Continue reading “Leading also have range coupling are ventilated into the environment”